THE GRANT APPROACH
A clear plan
from the outset.

Grant brings commercial, design and delivery experience together early, giving the project team a clearer understanding of the programme, information, procurement and construction requirements.

for complex fit outs.
for tight deadlines.
through the details.
whatever the scale.
THE GRANT METHODOLOGY

Putting the work in before work begins.

For Grant, predictability means giving clients confidence in programme, cost, quality and the integrity of the design.

Before mobilisation, Grant’s commercial, design and delivery teams review the information available, test the programme and identify what could affect delivery. Constructability, design information, M&E coordination, procurement, long-lead items and access are considered while there is still time to make informed decisions.

Experienced people, involved throughout

Senior leadership remains closely involved in Grant projects, working alongside project managers, commercial and design teams and providing direct input where their experience can support decisions.

Grant also works closely with architects, project managers, quantity surveyors, consultants and specialist contractors, protecting the design intent while considering how the project will be constructed and delivered.

From planning through to handover

The programme brings together design information, procurement, approvals, access and construction activities.

Progress and project risks are managed against that programme, supported by regular communication and structured reporting throughout delivery.

Industries We Support
Get a Free Quote
Contact Us
SAFETY

Safety is our culture.

Safety is treated as a KPI, with performance reported and reviewed alongside programme and cost. We set clear expectations and responsibilities to maintain a safe and healthy workplace for everyone involved in or affected by our activities.

Safety Philosophy

No major accidents to date. Health & safety is built into daily site management and measured with the same rigour as programme and cost. Risk is managed from design through delivery, using the hierarchy of controls, with frontline workers consulted on RAMS. Mental health is supported through a Mental Health First Aider and trained managers.

Independent Audits

Independent health and safety audits are carried out every two weeks, with site scores feeding into operational KPIs and project performance reviews. External H&S audits across every live project have achieved an average NEBOSH site audit score of 95%.

Safety Management System

Every project operates under a Construction Phase Plan, with full RAMS and permits developed before work starts and governed by our ISO 45001-certified system. Health & Safety reports directly to Paul Grant, COO, supported by a dedicated SHEQ Manager and Site Managers responsible for daily compliance.

Training & Competency

Every worker is inducted before entering site, with ongoing toolbox talks and competency checks. Specialist subcontractors are verified against defined competency requirements before starting work.

Zero RIDDOR accidents and lost time incidents (24/25), 95% average NEBOSH site audit score, 1,538 training hours and 154 toolbox talks since January 2025
Accreditations: ISO 45001, SafeContractor, Construction Industry Federation, Achilles, Cyber Essentials Plus, Constructionline and Builder's Profile
QUALITY

Quality is built.

Our philosophy: the right conditions produce the right outcomes. When site teams have accurate, coordinated information, clear sequencing, and the time to do the job properly, quality is the natural result. By the time finishes are installed, the foundations for quality have already been laid.

Quality Assurance Process

Every project runs through our own SharePointbased Common Data Environment, starting with a Master Information Delivery Plan that’s tracked right through to handover.

Inspection Procedures

Dedicated site supervision, weekly quality reviews and real-time Fieldwire records keep inspections, snagging and actions tracked throughout the project. Consultant and client inspections are brought forward, allowing issues to be addressed before cleaning and handover.

Handover Process

A dedicated close-out dashboard activates around a month before handover, tracking BCAR and O&M submissions from every subcontractor, reviewed by our BIM & Design Manager.

Sign-Off Process

RFIs, technical submittals and the latest drawing revisions are managed through the CDE, with staged approval from consultants and subcontractors before work proceeds.

Sustainability

ESG is Embedded in How We Build

Our ESG strategy is built into how projects are procured and delivered, from the materials we choose to the buildings we bring back to life, with measurable environmental, social and governance targets supported by systems, people and reporting.

Environmental

Sustainability is considered from design onwards, with early client workshops built around shared ESG objectives.

Social

We support our people and local communities through apprenticeship programmes, charitable partnerships, local sponsorship and wellbeing initiatives, while maintaining strong standards for health, safety and employee wellbeing.

Governance

Our governance framework supports ethical decision-making, transparency and accountability across the business, with oversight from our Non-Executive Chair and Board and an Integrated Management System supporting consistent standards and reporting.

Retrofit & Decarbonisation

Our £6.7M Moxy Hotel Belfast project refurbished an existing building into a 179-bedroom hotel, retaining and upgrading the base structure rather than starting again. A company-wide target to reduce our carbon footprint by 5% since January 2025 supports energy-efficient specification across retrofit and refurbishment projects.

Project software used by Grant Fit Out, including Microsoft Project, Autodesk Revit and SharePoint
Digital Delivery

Built around project information.

Grant developed its digital delivery approach through a Knowledge Transfer Partnership with Southern Regional College in Newry. This led to the development of its Common Data Environment, dashboard framework and ISO 19650-aligned workflows.

The system was designed around recurring challenges in fit-out projects, including coordination gaps, outdated drawing revisions, missing information and long-lead items identified too late.

A Common Data Environment

Grant uses a bespoke Microsoft SharePoint Common Data Environment to give commercial, design and delivery teams access to current project information.

Before mobilisation, drawings, programme information and project requirements are reviewed to identify gaps and risks. The same process continues through approvals, construction and final handover.

Reporting Throughout The Project

Grant's dashboards bring programme, quality, health & safety and procurement information into one reporting process, giving clients and project teams visibility of current project information.

Power BI, Fieldwire and MS Project form part of the digital toolset, with Fieldwire also supporting staged quality checks and defined hold points during delivery.

THE APPROACH IN PRACTICE

Built around the requirements of the project.

A hotel remaining open during refurbishment has different requirements to a retail project working towards a fixed opening date or an office fit out being delivered within an occupied building.

Grant establishes those requirements and builds them into the programme. The project team then has a clear basis for coordinating design information, procurement, access, specialist contractors and construction activities around the conditions of the project.

That approach continues throughout delivery, with Grant’s site teams working directly with the people responsible for the building and senior leadership remaining closely involved as the project progresses.

See the Grant Approach in practice.

Explore Grant’s fit out, refurbishment and retrofit projects.

TESTIMONIALS

“Grant Fit Out’s technical expertise, collaborative approach and strong project management were instrumental in the successful delivery of this complex refurbishment. They consistently provided practical solutions, maintained clear communication and delivered high-quality workmanship within a challenging live environment.”  

Project Architectural Technologist — Associate
Corgan

“We worked closely with Grant Fit Out on this project from start to finish. The quality of their workmanship, attention to detail and overall design packages is absolutely amazing. They were excellent to work with and I would highly recommend them.”

David Usher
Indoor Padel Ireland

“Grant Fit Out have successfully delivered approximately 10 store fit-outs for Tesco Ireland over the past three years, across both our Large Format and Express store portfolios. They have consistently demonstrated a professional, proactive and flexible approach, delivering quality projects within demanding programmes while maintaining a strong focus on collaboration and meeting our operational requirements.”

Arlene Maguire
Tesco Ireland

“Grant were appointed as main contractors for the build and fit out of this first class global facility.  Covering 30,000 sq. ft. this was an extension to their existing headquarters. IKON has been built to the highest standards of sustainable design and is a showcase for high-performance envelope design using 18 Kingspan products and systems.”

Kingspan Group

“Grant Fit Out successfully delivered a large and complex refurbishment at Moxy Belfast, involving works across six floors within a challenging city-centre hotel environment. The project was managed professionally from start to finish, with a strong focus on programme, coordination and quality of finish. Following their outstanding performance, they have also delivered a further 2 hotel refurbishment projects in Dublin.”

John Lally
MHL Hotels