Client Vision

The project involved transforming the existing space into a contemporary, flexible workplace for incoming tenants. The design combined open-plan workspace with meeting and collaboration areas, using acoustic treatments, natural finishes and planting throughout the interior.

Energy-efficient building services, LED lighting and occupancy sensors were incorporated alongside the architectural fit out to support the ongoing performance of the workspace.

The Challenge

Grant was delivering a full office refurbishment on a live Belfast city-centre site within a 14-week programme. The works began with a complete strip-out before progressing through M&E, partitions, ceilings, bespoke joinery and detailed finishes.

The live environment placed additional constraints on the programme, including restrictions around noise and the need to coordinate construction activity with the wider operation of the building.

Grant's Solution & Delivery

As Main Contractor, Grant coordinated the architectural and M&E packages from strip-out through to completion, sequencing the works around the 14-week programme and the restrictions of the live site.

Design information, procurement and subcontractor packages were managed against that sequence so each area could progress through first fix, architectural works and finishes without losing sight of the completion programme. Particular attention was given to the interfaces between services and detailed elements such as glazed partitions, acoustic ceilings, bespoke joinery and acoustic pods.

Grant's site team managed quality as the fit out progressed, reviewing completed works before subsequent trades moved through each area and coordinating issues with the project and design teams as they arose.

Scope of Works

  • Full strip-out
  • M&E services
  • Glazed partitioning
  • Bespoke joinery
  • Acoustic ceiling systems
  • LED lighting and occupancy sensors
  • Acoustic pods
  • Oak finishes and internal planting

Outcome

The completed fit out transformed the existing space into a flexible contemporary workplace, combining open-plan working, meeting and collaboration spaces with acoustic treatments and energy-efficient building services. Grant delivered the project on a live site within the 14-week programme.